Project:
Beresford, Sauchiehall St, Glasgow
Area:
250m²
Specification:
Removal of existing waterproofing back to substrate, apply Moy Materials Quick Dry Primer, torch apply Top S vapour control layer, bond in PU adhesive Moy Materials tapered insulation scheme, torch apply Top S underlay, torch apply Moy Materials Paralon HRDS mineral capsheet.