<<< Case Studies

 

Project:
Beresford, Sauchiehall St, Glasgow

Area
:
250m²

Specification
:
Removal of existing waterproofing back to substrate, apply Moy Materials Quick Dry Primer, torch apply Top S vapour control layer, bond in PU adhesive Moy Materials tapered insulation scheme, torch apply Top S underlay, torch apply Moy Materials Paralon HRDS mineral capsheet.

<<< Case Studies